77 feet long
Design Build
Hal Lott Photography
Wilson Structural Engineering
Switch ties that came from Oklahoma took 18 months to gain permits to build this magnificent bridge in order to gain access to the backside of the ranch during high water season.
Designed to imitate the Narrow Gauge Railroad era and style!